Skip to content
Monday – Friday: 7:00 am – 5:00 pm · Saturday – Sunday: ClosedMonday – Friday: 7:00 am – 5:00 pmC-20 HVAC and C-10 Electrical · CA Lic. 000000Verify(510) 555-0100

Sample plan

A sample electrification plan.

For a two-story house from the 1950s, in the Oakland flats, with a gas furnace and a 100-amp panel. This is the form your plan takes. The numbers and models in yours come from your visit.

  • 01
    HVAC

    Ducted heat pump

    One outdoor unit and an air handler sized from the load calculation, connected to the existing ducts after a leakage test.

    • Model and capacity named

    • Refrigerant lines and condensate drain

    • Startup and airflow check

  • 02
    HVAC

    Duct repairs

    Seal and insulate the runs we can reach. Replace any section the test says can't be sealed.

    • Test before and after

    • Insulation on attic runs

  • 03
    HVAC

    Thermostat and controls

    A thermostat that matches how the household uses the house, set up and explained.

    • Schedule and setback

  • 04
    HVAC

    Removal of old equipment

    The furnace and air conditioner removed, refrigerant recovered, the gas line to them capped.

    • Hauled away

  • 05
    Electrical

    Panel upgrade

    A new panel with room for the new loads, or a subpanel if the load calculation says that is enough.

    • Load calculation attached

    • Utility work requested if needed

  • 06
    Electrical

    Dedicated circuits

    One for the heat pump, and capacity left for a range, a dryer or a car charger later.

    • Labeled at the panel

  • 07
    Permit

    Permits and inspection

    Mechanical and electrical permits, and both inspections scheduled with you.

    • Days someone needs to be home

  • 08
    Left out

    Not in the plan

    Closing the gas service at the meter, which your gas utility does. Drywall painting. Any scope you choose to leave for later.

Your decisions

What the plan asks of you.

  • Keep the furnace or not

    The plan prices both, so you can see what each choice does to the panel and the schedule.

  • Build circuits now or later

    Wire for the range, the dryer and the charger now, or leave the capacity and add them when you buy the appliance.

  • Programs

    We list the utility and state programs that look open for your address, and what each one asks you to do. Programs decide who qualifies.

Want a plan like this for your house?

Book an assessment and we'll write yours.