Skip to content
Monday – Friday: 7:00 am – 5:00 pm · Saturday – Sunday: ClosedMonday – Friday: 7:00 am – 5:00 pmC-20 HVAC and C-10 Electrical · CA Lic. 000000Verify(510) 555-0100

Service

Panels and service

A panel and service with room for a heat pump, a car charger and an induction range.

The panel is where the house's electricity is shared out. Its size and condition decide how much new equipment the house can take.

A meter socket and two disconnect boxes mounted on a tan block wall

Signs

When it's time to look at this.

  • The panel has no free slots

    Every space is used, or breakers share one.

  • You're adding a heat pump

    It's the biggest new load most houses take on.

  • You want a car charger

    It needs its own circuit and the capacity to run it.

  • The panel is an older model

    Some older panels are hard to get parts for.

  • Breakers trip when you add a load

    That's the house telling you the loads exceed what the circuit was meant for.

  • The meter and mast are old

    A service upgrade may need the utility's work too.

The visit

What happens at the visit.

  1. 01

    Step 1: We open the panel

    We look at what's connected, what's rated and how much room is left.

  2. 02

    Step 2: We add up the loads

    A load calculation for what the house has now and what you plan to add.

  3. 03

    Step 3: We write the plan

    A new panel, a subpanel or neither, and the work around it.

  4. 04

    Step 4: You decide

    We request any utility work and schedule the inspection once you agree.

Cost

What drives the cost.

We don't print prices here. These are the things that move the number, and the plan prices each one.

  • Panel size

    From the load calculation.

  • Service

    Whether the meter, mast and wire stay, or the utility upgrades them.

  • Location

    A panel that must move costs more than one that stays.

  • Wall and ceiling access

    Fishing wire through finished walls takes time.

  • Permit and inspection

    Pulled by us; the utility's own work is scheduled separately.

  • What gets labeled

    Every circuit, so the next person isn't guessing.

Questions

Questions about this work

Will my panel handle a heat pump?

It depends on the house. We add up what the panel carries now and what you want to add, using a load calculation, before we choose any equipment. If the panel is full, the plan says whether a new panel or a subpanel is the smaller change.

Which programs can lower the cost?

Utility and state programs change often, and some depend on household income. We tell you which ones look open for your address when we write the plan. The program, not us, decides who qualifies, and we don't promise any amount.

Do you pull the permits?

Yes. We pull the mechanical and electrical permits, schedule the inspections and tell you which days someone needs to be home.

Related

Often planned with it.

Start with the assessment.

We walk the house, check the panel and write the plan. You can stop after any step.