Skip to content
Monday – Friday: 7:00 am – 5:00 pm · Saturday – Sunday: ClosedMonday – Friday: 7:00 am – 5:00 pmC-20 HVAC and C-10 Electrical · CA Lic. 000000Verify(510) 555-0100

Service

Circuits and chargers

Dedicated circuits for the appliances going electric, wired now or planned for later.

A dedicated circuit serves one appliance. It keeps a range, a dryer, a water heater or a charger from sharing power with the rest of the house.

A black wall-mounted car charger with a lit display and a cable plugged in

Signs

When it's time to look at this.

  • You're buying an induction range

    It needs a circuit of its own, often a bigger one than the gas range had.

  • A heat pump water heater is next

    It needs a circuit near where it will stand.

  • You're getting an electric car

    A charger needs a dedicated circuit and a place to mount.

  • The dryer is gas

    An electric dryer needs a different outlet and circuit.

  • You want to be ready

    We can run wire and leave capacity so later changes don't open the walls again.

  • The circuits aren't labeled

    A panel with no labels slows every future job.

The visit

What happens at the visit.

  1. 01

    Step 1: We walk the house

    Where each appliance will stand and how the wire will get there.

  2. 02

    Step 2: We check capacity

    Whether the panel has the room and the service has the margin.

  3. 03

    Step 3: We write the plan

    Each circuit on its own line, with its location and its rating.

  4. 04

    Step 4: You decide

    You choose which circuits to build now and which to leave for later.

Cost

What drives the cost.

We don't print prices here. These are the things that move the number, and the plan prices each one.

  • Distance

    The wire run from the panel to the appliance.

  • Access

    Through finished walls, an attic, a crawlspace or the garage.

  • Rating

    A range circuit is larger than a charger's.

  • Charger

    The unit you choose, and whether it mounts inside or out.

  • Panel

    Whether there's a free slot or the panel has to change.

  • Permit

    A permit for each new circuit, pulled by us.

Questions

Questions about this work

Will my panel handle a heat pump?

It depends on the house. We add up what the panel carries now and what you want to add, using a load calculation, before we choose any equipment. If the panel is full, the plan says whether a new panel or a subpanel is the smaller change.

Which programs can lower the cost?

Utility and state programs change often, and some depend on household income. We tell you which ones look open for your address when we write the plan. The program, not us, decides who qualifies, and we don't promise any amount.

Do you pull the permits?

Yes. We pull the mechanical and electrical permits, schedule the inspections and tell you which days someone needs to be home.

Related

Often planned with it.

Start with the assessment.

We walk the house, check the panel and write the plan. You can stop after any step.